Rare is the designer equally masterful in engineering and aesthetics; rarer still is one who makes it look easy. Meet Christian Dimbleby. Last summer, BUILD’s Andrew van Leeuwen visited London to speak with White Arkitekter’s UK Head of Sustainability. They discussed the UK’s proposed cap on timber height, why water worries him more than fire, and what AI can’t do for the next generation of architects.
Tell me about your role and how you became an expert in sustainability and mass timber construction.
I’m Head of Sustainability at White Arkitekter’s UK office. I trained as an architect and building services sustainability engineer, and I’ve spent twenty-odd years delivering some of the UK’s lowest-carbon buildings, from Passive House schemes to mass timber projects like Holy Trinity Primary School and Harris Academy Sutton, one of the UK’s largest timber buildings. My current project, the new Velindre Cancer Centre, has a 3,600-square-metre mass timber roof over its atrium. I also lecture on timber and embodied carbon at several universities and helped develop carbon assessment software.

How did timber fall out of favor for large-scale, commercial and multi-family buildings over the last hundred years and why is it the preferred material again?
Timber fell out of favour with modernism, when concrete, steel and glass allowed buildings to go higher. That’s changing; buildings like the Sara Cultural Centre in Sweden show how tall you can build in mass timber, rivalling steel and concrete, and it offers comparable strength at a fraction of the carbon, since it’s a rapidly renewable resource. There are challenges, though, particularly in the UK. Lately I’ve been collaborating with Built by Nature, which is a European – not-for-profit foundation that encourages the use of biobased materials. My work with them focuses on a response to fire safety regulations in the UK that are currently under review – these regulations propose that any timber structure over eleven metres be boarded over.
Is that boarded over with something like gypsum wall board?
Yes, totally encased, which strips away all the aesthetic appeal. The threshold is eleven metres or about four storeys, and above that they’re proposing an effective ban, which would decimate an industry that’s only just reached a reasonable size. White Arkitekter plus a series of other UK firms such as Waugh Thistleton Architects, Elliott Wood, Engenuiti and others organised a toolkit response through Built by Nature. Because the concern is fire risk, building regulations set the default standard that any alternative has to beat, so a cap like this tends to stick. My argument is that regulators shouldn’t ban timber outright just because they lack the fire engineering expertise to assess it properly; instead, require anything over eleven metres to be designed by a fire engineer, with the appropriate safeguards. It’s still under review.
While this is being decided, what’s the current height limit for mass timber construction in the UK?
Technically, there isn’t one. There’s an eighteen-metre limit on combustible materials in the external facade, and others have separate funding rules add their own constraints. For instance Greater London Authority (GLA) funded projects can’t use timber on external facades above ground level, a rule that traces back to the Grenfell fire from 2017, so the structure has to move inboard to the floor plates. The government is due to respond to the fire review this autumn, though a new Prime Minister could shift the outcome. There’s also growing pressure in Parliament to legislate embodied carbon limits, along the lines of the UK Net Zero Carbon Building Standard [UKNZCBS] I was also involved with developing and testing, which pushes down embodied carbon targets through 2040 via more efficient buildings, lower-carbon materials like timber, and material reuse.
There is criticism that as mass timber structures go taller, they require added weight at the top for wind resistance, and if that weight is added with steel or concrete, it can undercut the very sustainability savings you’re trying to achieve with the timber framing in the first place. What are your thoughts?
At the Sara Cultural Centre in Sweden, we added a swimming pool on the roof. It’s heavy enough to do the job, but removable later if needed, and a nice amenity for the hotel and possibly the public. Water tanks work the same way. On my very first mass timber project, Holy Trinity Primary School , we even looked at hanging rocks in a net for thermal mass, since timber’s thermal performance wasn’t well understood at the time, though we dropped the idea for a school. Instead having a green roof on top; there are plenty of ways to add mass without resorting to CO2 heavy concrete.
Added mass at the top of a mass timber frame building is only necessary for taller structures, like the twenty-four-storey Sara Cultural Centre. For four to six storeys, typical of housing, you don’t need it at all, maybe just a green roof for a touch of extra mass.


Given your background in sustainability, Cross Laminated Timber (CLT), and mass timber, was there a particular project that was the tipping point, where you saw the potential and it changed the direction of your career?
Harris Academy Sutton was the clearest turning point. It’s on a sloping site, so the ground floor is concrete just to level things out, but the three floors above are mass timber. The concrete work took a year and the timber went up in six weeks. It won a Royal Institute of British Architects (RIBA) National Award, and following the Grenfell fire, the fire engineer had to calculate the fire resistance manually since all gypsum board products were recalled and not yet reinstated. It turned out the timber alone met the requirement, so it could stay exposed throughout. It’s a genuinely lovely space. The council was worried at first that students might damage a secondary school made out of wood, but the students have respected it. It feels calmer, more grown up, like a university, rather than the soulless white box schools you often see. That’s the project that’s stayed with me, and it’s why I keep pushing for natural materials.
Are there other advantages of mass timber that you enjoy as a designer?
Scale. CLT lets you push the structural grid much further than people expect. The sports hall at Harris Academy Sutton is one of the largest free-spanning halls built in CLT, with glulam beams at the top spanning twenty metres plus.
Mass timber dimensions in the United States are now limited less by technology and more often by transportation and what will fit on a flatbed truck. What are the limiting factors in the UK?
It’s the same story here. Our bridges and tunnels are tight, and wide loads on motorways get heavily restricted, so three-dimensional modular construction is rare; we mostly stick to two-dimensional modules. For long components, articulated lorries can carry almost any length, but height is capped at around three metres.
How did you get twenty-metre-long beams to the site for the Harris Academy Sutton sports hall?
They were shipped as two shorter sections and joined together on site.

Have you noticed different advancements with mass timber in other countries?
I keep a close eye on North America, specifically their regulations, the scale of the beams they’re using, and their fire testing data. It’s useful ammunition. When UK regulations try to cap height at eleven metres, I can point to a beam that’s just been tested and approved for a twenty-four or twenty-six storey building in the US.
Does precedent in other countries help you make the case in the UK?
Yes, we’ve always used precedent this way, showing early UK adopters examples tested in Europe, since most of our timber comes from Europe anyway.
Is there a mass timber supply chain within the UK?
Approximately one third of UK timber goes to fencing, a third to pallets, and so very little makes it into construction at all. Scotland’s has started some small-scale manufacturing, only small panels so far, but it’s a start. On sourcing within the UK, one project, the University of East Anglia Enterprise Centre, used timber from the local Thetford Forest. We worked with the UK building science and testing organisation, Building Research Establishment (BRE), to get it graded, since most UK species can’t be graded by machine.
Talk about the role of the Building Research Establishment.
The BRE used to be a government testing facility and became independent around 1990. It runs most UK testing and sets most UK standards. One of their timber specialists, Dr Ed Suttie, identified species that would otherwise be discarded as suitable for construction. However, there was no standards so had to be manually graded the old fashioned way, so we brought in a qualified grader from Ireland. The Timber Development UK [TDUK] has since trained many more people to do this. It means we can use more timber at a slightly lower grade overall, the same logic behind glue-laminated and cross-laminated timber, where the glue provides the strength rather than the individual pieces.
Let’s talk about the glue for a moment. Some technologies, like mass-ply and laminated veneer lumber (LVL) must use more of glue than a CLT panel does simply due to the increased layers and surface area of the wood veneer. This is probably the engineers’ territory, but do you ever get into the specifications, amounts, and technology of the glues?
I always specify formaldehyde-free glue, to limit volatile compounds, but I don’t get into the finer engineering detail. I’ve also been looking at dowel-laminated systems, what we call Brettstapel here in the UK, which use timber pins for attachment instead of glue. There’s a lot of development happening around that and timber nail technologies.
Does it still require glue when you use dowel or nail technology?
No glue. It works the same way old cathedral timber joints do: the dowels are a different species from the beams, so they swell at a different rate and expand to fill the gap rather than shrinking and working loose. A typical Brettstapel might be Sitka spruce and Douglas fir structure with beech dowels.
You mentioned there isn’t much timber stock in the UK to draw from. Where does the UK get most of its lumber for CLT panels, beams and glulam?
Mostly Europe, whichever forests are closest: Poland, Germany, Lithuania. Mills tend to sit next to the forests and truck the material out from there. Oddly little comes from Sweden (perhaps because it is all used for the internal market).
What are the biggest misconceptions about mass timber and CLT?
That it costs more and is more complicated. It doesn’t have to. Fire gets most of the attention, but it’s manageable with good design. Water is actually the bigger risk: recent insurance data suggests it causes more damage than fire, so the current guidance is to keep CLT off roofs altogether, since water damage can go undetected for years until it’s eaten right through the timber panels. If you want a timber roof, beams with a plywood top let you spot problems early. It really comes down to good design and not cutting corners.
What are the current challenges you’re working through with mass timber construction?
Fire and water, as mentioned. Beyond that, it’s convincing clients. Sustainability commitments have cooled recently, so a lot of my role is showing people, through completed buildings and real spaces, that timber is still the right choice.

Are there different considerations for mass timber in the health care sector?
Yes. We published a document called Wood for Health , covering where timber can and can’t be used in healthcare, including its antimicrobial properties and how to manage fire risk, and we’re now adapting it for the UK market. The government’s current Hospital standard defaults to concrete grids, so we’re pushing to show timber works just as well. Some areas genuinely need concrete, for instance an X-ray room has to be lead-lined, but most hospital spaces just need to be cleanable and support infection control, and timber’s health benefits can genuinely aid recovery. We’re planning a post-occupancy study at Velindre, comparing the new building against the old one on energy, satisfaction and quality-of-life measures, similar to the methodology used in the Measuring Mass Timber book.

What is White Arkitekter’s stance on the long-term future of mass timber buildings? Is there a preference for the circular economy, disassembling buildings and reusing the parts, or for adaptive reuse of the whole building?
I’m firmly in both adaptive reuse and circular economy whichever is most appropriate. I sit on the Architects Climate Action Network (ACAN) Circular Economy Task Force and just wrote a paper on the business case for reuse. Our own office reuse fit-out and furniture throughout, saving 40% on cost and carbon of the work. But I don’t see the two approaches as competing. University College London (UCL) has a process for reusing old CLT into small scale panels, still early days, but promising. And CLT is well suited to building on top of existing structures too, an approach some call opentopper.
Can you expand on the opentopper concept?
It means adding storeys on top of an existing building rather than starting from scratch. Timber is light weight and its speed make it ideal for those situations: drop a couple of storeys onto a block of social housing with minimal disruption to residents, and you’ve added homes without displacing anyone for long. Whitby Wood, the structural engineers, have been pushing this strategy for some time, its got a whole website, optoppen.org, that shows how it’s done. I love it: it’s just so much easier with timber than with any other approach.
Are there blind spots in mass timber design and construction, areas that need more advancement?
Yes, in species diversity. Most CLT comes from single-species forests, which makes the whole supply chain vulnerable; something like ash dieback could wipe out a huge resource overnight. The industry’s been replanting three trees for every one felled, but all the same species, in the same concentrated areas. We need more diverse forests, and we need to help clients accept that diversity rather than expecting one uniform, sleek finish.
So, it’s really about forestry management and sourcing. Would that extend to structural engineers needing to calculate hybrid beams and panels made from different species?
Exactly. There are already a few species used for aesthetic reasons. On one school project we specified sweet chestnut glulam beams, exposed and solid all the way through, not veneered, since everything’s made to order. But CLT plants prioritise consistency, so the real challenge is integrating multiple species without needing separate production lines for each, and figuring out how to harvest, grade and rate a mixed supply. The thinking is that the UK’s climate will increasingly resemble Europe’s, so we should be planting what Europe grows now, though Europe may need to diversify too.

You teach as well. What advice do you have for architecture students entering a difficult economy with AI as their competitor? How do you give them hope?
Show them what good design can really achieve, that’s the whole point. Our strapline at White is joyful architecture, and that’s what I’d tell them to aim for. AI can handle the boring parts, but what excites me is solving problems nobody else has solved: how do you persuade regulators to allow timber, not just specify it? How do you bring people along, build a more circular economy, and set and monitor standards? That’s a matter of judgement, not something AI can do for you.
AI can’t do a lot of what you just described.
Exactly. I rarely do the drawings myself anymore, AI will probably be able to handle that. What we can do is focus on what it can’t: thinking ahead, and bringing joyful solutions.

Christian Dimbleby, MEng, DipArch, ARB, MCIBSE, is uniquely qualified as both an Architect and Chartered Engineer (CIBSE). He joined White Arkitekter in 2025 as Head of Sustainability UK, and helps support the team to deliver on White Arkitekters leading sustainability commitments for all the UK projects. Prior to this he worked at Architype architects for twenty years.
Christian has been at the cutting edge of delivering buildings that actually are low in energy use, having championed innovative processes such as Passivhaus, BSRIA Softlandings Framework and Building Performance Evaluation (BPE / POE) long before they were mainstream. Christian’s completed projects are known for utilising biobased and innovative natural materials, with his expertise in the topics around Embodied and Whole Life Carbon. Christian technical and research skills have resulted in many positive experiences from integrating innovative materials into projects.
He is a passionate advocate for retrofitting buildings, to make better use of what we already have, and volunteers on the ACAN Circular Economy Taskforce. Christian also gives lectures to several university master’s courses and is often speaking at public events to share best practice in sustainable design.
Interview funded in part by the Thuréus Research Home and Nature Monument Foundation for Culture, Nature, Literature and Art